NETWORK ADDRESSES CAN BE AUTOMATICALLY ASSIGNED TO DEVICES SIMULTANEOUSLY WITH RISER DIAGRAM CREATION.
WE STRICTLY ADHERE TO NFPA-72, NFPA-101, AND BEST LIFE SAFETY PRACTICES DURING MODELING AND DRAWING CREATION.
REST ASSURED, WE WILL CALCULATE VOLTAGE DROPS AND BATTERY CAPACITY.
COMPLETE INFORMATION, FULLY INTEGRATED WITH OTHER SYSTEMS (HVAC, SMOKE MANAGEMENT, BMS, ELECTRICAL, FIRE SUPPRESSION), CAN SIGNIFICANTLY IMPROVE CONSTRUCTION AND MAINTENANCE EFFICIENCY.
AUDIO-VIDEO SYSTEMS ENHANCE BUILDING COMFORT AND FUNCTIONALITY, INCLUDING ANNOUNCEMENT AND AUTOMATED VOICE SYSTEMS, SOUND MASKING SYSTEMS, ROOM PROJECTOR/SCREEN SYSTEMS, CONFERENCE ROOMS, AND HUDDLE ROOM SYSTEMS.
MODELING AND CHECKING ACCESS CONTROL DOOR DEVICES FOR COMPLIANCE WITH THE BUILDING'S ACCESS-EGRESS STRATEGY.
COORDINATING AV SYSTEMS WITH VIDEO DEVICES BASED ON THEIR RESOLUTION AND SOUND PRESSURE CALCULATION.
BOTH ELECTRICAL AND CONTROL ENGINEERING ARE INTEGRAL PARTS OF OUR INDUSTRIAL PROJECTS (FOOD AND CHEMICAL PROCESSING PLANTS, PHARMACEUTICAL, OIL AND GAS SECTORS, STEEL AND MACHINERY PLANTS).
AT THE INITIAL STAGE OF THE PROJECT, WE POSITION ALL INSTRUMENTS ACCORDING TO THE I/O LIST AND DETERMINE THE BEST LOCATIONS FOR MAIN CABLE ROUTING IN COORDINATION WITH OTHER TRADES.
IN THE LATER STAGE, WE REVIEW P&IDs AND INPUT THOUSANDS OF DATA POINTS INTO THE INSTRUMENTS' REVIT FAMILIES. THIS INITIAL DATA ENABLES AUTOMATIC CREATION OF CONNECTION DIAGRAMS AND WIRING DETAILS.
FINALIZED, COORDINATED, AND INTEGRATED PROCESS CONTROL SYSTEM PRE-CONSTRUCTION DOCUMENTATION SIGNIFICANTLY REDUCES CONSTRUCTION AND MAINTENANCE COSTS.
WITH OUR EXPERIENCE IN DATA CENTER PROJECTS, WE FIND THAT TELECOM CAN SOMETIMES BE MORE COMPLEX THAN ELECTRICAL IN TERMS OF MODELING AND COORDINATION. HOWEVER, NOTHING IS IMPOSSIBLE FOR US.
WE UTILIZE CODES AND DESIGN STANDARDS SUCH AS ANSI/BICSI-002, ANSI/TIA-942-A, AND ANSI/TIA-568, ALONG WITH OPERATION STANDARDS AND BEST DESIGN PRACTICES, TO CREATE FULLY COORDINATED BIM MODELS AND CONSTRUCTION DRAWINGS.
A 4-D MODEL CAN ALSO BE CREATED AS A TIME AND MANPOWER-SAVING TOOL DURING THE INSTALLATION OF TELECOMMUNICATION RACKS.
FEEDER & BRANCH REDLINES AND CONDUIT & WIRING SCHEDULES AT THE INITIAL PROJECT STAGE. WE ANALYZE DESIGN SETS TO ENSURE ALL DEVICES ARE PROPERLY FED ACCORDING TO LOADS, CHECKING VOLTAGE DROP, CONDUIT FILL, AND DERATING FACTORS FOR HOMERUNS.
CREATING AN ELECTRICAL BIM MODEL THAT CONSIDERS BEST PRACTICES AND SITE-SPECIFIC CONSTRUCTABILITY REQUIREMENTS. THE CONDUIT SCHEDULE FROM ITEM 1 WILL BE INCORPORATED INTO REVIT PARAMETERS.
IMPLEMENTING EFFECTIVE COORDINATION APPROACHES AND PARTICIPATING IN COORDINATION MEETINGS WITH OTHER TRADES.
PROVIDING DETAILED SHOP DRAWINGS FOR THE SITE TEAM, CREATING HIGHLY DETAILED DOCUMENTS TO REDUCE TIME, LABOR, AND MATERIAL WASTE.